콘텐츠로 건너뛰기

HOME > About > Performance

About

UST21 – Connect the Present of the Ocean and the Future of the World Together

Performance

전체 58
YEAR 사업명 발주처
YEAR Title Executing organization Main Client
2019
Bathymetric Surface Production (S-102) & Hydrographic Survey System Verification
2019. Korea Hydrographic and Oceanographic Agency (KHOA)
Korea Hydrographic and Oceanographic Agency (KHOA)
2019
Bathymetric Survey of Ulsan Port
2019. Ulsan Port Authority
Ulsan Port Authority
2019
Nautical Chart Production of South Sea
2019. Korea Hydrographic and Oceanographic Agency (KHOA)
Korea Hydrographic and Oceanographic Agency (KHOA)
2018
Geophysical Survey of South West Sea (West Jeju Island)
2018. Korea Hydrographic and Oceanographic Agency (KHOA)
Korea Hydrographic and Oceanographic Agency (KHOA)
2018
Nautical Chart Production of South East Sea
2018. Korea Hydrographic and Oceanographic Agency (KHOA)
Korea Hydrographic and Oceanographic Agency (KHOA)
2017
Marine Geophysical Survey for SHINAN UI OWF Project
2017. Hanwha E&C
Hanwha E&C
2017
Exterior Integrity Survey for Submarine Pipeline of SPM Buoy
2017. Hyundai Oil Bank
Hyundai Oil Bank
2017
Under-keel Clearance Survey for Float On/Off of Appomattox, Korea
2017. Samsung Heavy Industries
Samsung Heavy Industries
2016
Marine Geophysical Survey for Submarine Cable Laying
2016. POSCO Engineering
POSCO Engineering
2016
Exterior Integrity Survey for Submarine Pipeline of SPM Buoy
2016. Hyundai Oil Bank
Hyundai Oil Bank
2015
Dredging Survey for shipping channel
2015. Royal Boskalis
Royal Boskalis
2015
Shallow Water Survey for the submarine cable laying between Ulleung and land
2015. KT Submarine
KT Submarine
2014
Under-keel Clearance Survey for Mipo Shipyard, Ulsan, Korea
2014. Hyundai Heavy Industries
Hyundai Heavy Industries
2014
Desktop Survey for Submarine Cable between Land and Ulleung Island
2014. KT Submarine
KT Submarine
2013
Exterior Integrity Survey for Submarine Pipeline of SPM Buoy
2013. Hyundai Oil Bank
Hyundai Oil Bank